Cookie settings

This website uses cookies. A cookie is a small text file in the source code of the website that allows the website to send information to the user's browsing device or browser and to access the data stored by the cookie on the user's browsing device. More information about how cookies work, how we use them and how to change the default cookie settings, can be found here.

Marketing cookies are targeted advertising cookies that store information about users’ behaviour by tracking browsing habits and history, which enables the display of personalized advertisements from third parties. The website ina.hr does not use this type of cookie.

No cookies to display.

Always Active

Strictly necessary cookies are cookies that ensure the proper functioning of the website and facilitate its use. Without the use of these cookies, parts of the website will not function properly, therefore it is not possible to disable these cookies.

Performance cookies are cookies that allow tracking the number of visits and traffic to measure and improve the website's performance. By default, these cookies are always disabled when the website is opened and are only activated with the user's consent. The user's consent can be withdrawn at any time.

INA starts off-taking raw natural gas from Slovenia

    • The first amounts of raw natural gas produced by Geoenergo from wells near Lendava, in Slovenia, was delivered to INA
    • Daily deliveries will comprise of around 70.000 m³ of raw natural gas
    • This projects links the production system in Slovenia with Ina’s production system in Croatia, which opens up the possibility of expanding upon the cooperation in the future

    Zagreb, 3rd November 2017 – Ina’s production system received the first amounts of raw natural gas manufactured by Geoenergo at two wells (Pg-10 and Pg11A) in the Petisovci gas field near Lendava, in NE Slovenia. INA and Geoenergo meet all the technical, administrative and legal prerequisites for this deal, stipulated in July 2016.

    Raw natural gas is transported via the system of production gas pipelines to the Central Gas Station in Molve, where it is processed, and prepared for commercial use. Daily deliveries will comprise of around 70.000 m³ of raw natural gas, and the Delivery Contract with Geoenergo is made for a one-year period, with the possibility of extension.

    Linking the production system in Slovenia with Ina’s production system in Croatia opens up the possibility of expanding upon the cooperation in the future. “This project is significant for INA because it increases the utilisation of existing production capacities of the company, and the processed gas will be placed on the domestic market. We are also pleased that this project is an example of cross-border cooperation in the energetics field, which is in accordance with the directives and policies of the European Union on the matters of mutual energy policy of member-states.”, said Mr. Tvrtko Perkovic, the Operational Director of Exploration and Production of Oil and Gas.

    The realization of this project is in accordance with the Croatian and European energy regulation, which provides negotiating access of a third party to the network of production gas pipelines.
    About INA Group
    INA Group is the leader in the Croatian oil business, and a significant regional company, in the fields of research and production of oil and gas, processing of crude oil, and the distribution of oil and petroleum products. INA Group is comprised of multiple subsidiaries, fully or partially owned by INA, d.d. The Group’s headquarters is located in Zagreb, Croatia. In the field of oil and gas research and production, INA also operates in Angola and Egypt. The processing of oil is done in Ina’s oil refineries in Rijeka and Sisak, and its regional retail network consists of 495 petrol stations in Croatia and its neighbouring countries.

    PR            
    Avenija Većeslava Holjevca 10, Zagreb
    Tel:  01 6450 552|Fax: 01 6452 406| @: pr@ina.hr

Documents